1How much will my kitchen cost?
Unfortunately it is cannot be possible to give an upfront price on a kitchen. The best option is to supply some measurements & choose some finishes at your local showroom to get the fastest price.
2How long will my kitchen take?
The lead time on a kitchen is often governed by the materials. Some materials such as vinyl or 2pac doors have to be sourced from the mainland therefore there is a longer lead time. As a standard supply only kitchen with melamine doors & laminate tops the turn around time can be as little as 2-3 weeks, alternatively if you require your kitchen to be installed we will have to look at the availability of an installer.
3How long will the installation take?
More often than not a kitchen will take no more than a day to be installed. If there are more joinery items to be fitted it may take a longer period of time. It is best to check on a job by job basis to find out the estimated install time.